Quantool · Reading CoursesFictional examples · no live trading
Advanced Options · ADV-12b · Advanced

Put backspread

How does put backspread express a large downside with an intermediate loss valley view?

One concept per page · original written lesson · 538 prose words · authored, not installed or production-approved

What you will learn and prerequisites

Read first: Read a contract and its premium, Rights, obligations and expiration, Defined payoff risk is not margin, Read the whole multi-leg ticket

A put backspread sells one higher put to finance two lower puts. It seeks a sufficiently large fall. A moderate correction can be worse than no movement at all.

Construction: read every leg

Opening credit is 100. At 95 the short put owes 500 while the long puts have no intrinsic, creating 400 loss. Below 95, the extra long put eventually wins. Breakevens are 99 and 91. Downside profit is finite because the stock cannot go below zero.

Read the ticket before the graph

BUY means you own an option right; SELL means you accept a short-option obligation. Positive quantities are long and negative quantities are short in the calculation. Check quantity, call/put, strike, multiplier and expiry before netting premium.

All legs in this example share November 20, 2026 expiration. The entry observation is October 6, 2026, with fictional QLT at 100. These are independent illustrative premiums, not a current option chain or executable quotes. The terminal diagram assumes every leg and any shares are resolved at one common settlement price.

Before expiry: time and volatility

A crash can create favorable long-wing Delta and Vega. A slow decline into the valley can do the opposite. Net Greeks depend on location, not only the count of purchased contracts.

Manage the position deliberately

Size using the valley loss. A portfolio needing protection against a modest correction may be better matched to a different hedge. Record the distinction between buying crash convexity and buying a simple floor.

Fictional teaching ticket · no order submission

Put backspread

QLT • reference spot $100 • independent illustrative prices • quote date 2026-10-06

Read action, quantity, type, strike, expiry, premium and multiplier before the payoff
ActionQtyTypeStrikeExpiryPremium/unitMultiplier
SELL1Put1002026-11-205100
BUY2Put952026-11-202100
Opening option cash (+received / −paid)100 USD
Entry option fees in cost variant1.95 USD
Shares included0
Joint-terminal results—not a guarantee of interim cash requirements
MeasureBefore costsAfter stated entry fees
Maximum terminal profit9,1009,098.05
Maximum terminal loss magnitude400401.95
Breakeven settlement price(s)91, 9990.9805, 99.0195

This is a mathematical expiry experiment using the displayed legs, not an executable quote. The slider range is not a risk limit.

$0.65 per option contract on entry only. No exit, assignment, financing or tax costs modeled.

Independent fictional premiums, not one simultaneous arbitrage-consistent chain. All legs realized simultaneously at intrinsic at the same expiry; terminal calculations do not model American early exercise, temporary unhedged positions, forced liquidation or live liquidity. Displayed chart domain is not a tail-risk cap.

From opening cash to a settlement result

Read the opening instructions: sell 1 100 put at 5.00; buy 2 95 put at 2.00. Option opening cash is $100.00 received as a credit. A received credit is not earned profit while the obligation remains open.

Set the common settlement price to 95.00. Calls have intrinsic value max(S−K,0); puts have max(K−S,0). Subtract the opening premium from each intrinsic value, then multiply by signed quantity and the 100-unit multiplier. Shares contribute their price change from their own cost. The calculation popup shows every leg.

The combined result is $-400.00 before costs and $-401.95 after illustrative opening fees of $1.95. Exit fees, slippage, funding, dividends and taxes are not included. Opening fees are 0.65 per option contract, not a statement of any broker's pricing.

Maximum terminal profit is $9,100.00; maximum terminal loss magnitude is $400.00, before costs. Isolated zero-P/L settlement points in the model: 91, 99. Move the scenario slider across each strike and explain why the slope changes there. A strike is a contract threshold, not a prediction.

This terminal model is useful for comparing risk shapes, but actual American-style assignment, share delivery, forced liquidation or a failed multi-leg exit can produce a different path. A long protective leg is not an automatic instruction that a broker must exercise it when another leg is assigned.

Open the calculation without leaving this lesson

Calculate this exact ticket

Same-page calculation. Closing restores the lesson position and originating control.

P/L = Σ[q × multiplier × (intrinsic − opening premium)] + shares × (S−share entry) − costs

Intrinsic is nonnegative before the signed quantity is applied. This is a fictional terminal calculation.

  1. -1 × 100 × (5.00 − 5.00) = $-0.00: 100 put.
  2. +2 × 100 × (0.00 − 2.00) = $-400.00: 95 put.
  3. Opening fees: 1.95.
Before costs $-400.00; after entry fees only $-401.95.

Maximum risk and breakevens

Same-page calculation. Closing restores the lesson position and originating control.

Evaluate S=0, all strikes and the final tail slope; solve P/L=0 on each linear segment.

Same-expiry payoffs are piecewise linear. A finite chart range cannot prove a tail is bounded.

  1. Maximum terminal profit is $9,100.00; maximum terminal loss magnitude is $400.00, before costs.
  2. Breakeven points: 91, 99.
  3. Costs shift net P/L downward without moving the strikes.
Maximum terminal profit is $9,100.00; maximum terminal loss magnitude is $400.00, before costs.

The whole ticket at common expiry

Vertical: P/L per complete ticket (USD)
Horizontal: Underlying settlement price (USD)

The whole ticket at common expirySolid combined curve is before fees; the second includes only the stated entry fees. Individual-leg lines explain construction. This is terminal intrinsic P/L, not current option value. Price can move outside the displayed range. The complete numerical data are available below.-537.125-182.665171.795526.255880.7151,235.18808794101108115
1. Combined terminal P/L before fees2. Combined terminal P/L after entry fees
Solid combined curve is before fees; the second includes only the stated entry fees. Individual-leg lines explain construction. This is terminal intrinsic P/L, not current option value. Price can move outside the displayed range.
See the individual legs behind the combined curveThe whole ticket at common expirySolid combined curve is before fees; the second includes only the stated entry fees. Individual-leg lines explain construction. This is terminal intrinsic P/L, not current option value. Price can move outside the displayed range. The complete numerical data are available below.-1,869-901.466.21,033.82,001.42,969808794101108115
1. Combined terminal P/L before fees2. Combined terminal P/L after entry fees3. Leg 1: SELL 1 100 put4. Leg 2: BUY 2 95 put
Read the graph as a data table
Complete graph data; original fictional observations or model calculations
Underlying settlement price (USD)Combined terminal P/L before feesCombined terminal P/L after entry feesLeg 1: SELL 1 100 putLeg 2: BUY 2 95 put
801,1001,098.05-1,5002,600
80.43751,056.251,054.3-1,456.252,512.5
80.8751,012.51,010.55-1,412.52,425
81.3125968.75966.8-1,368.752,337.5
81.75925923.05-1,3252,250
82.1875881.25879.3-1,281.252,162.5
82.625837.5835.55-1,237.52,075
83.0625793.75791.8-1,193.751,987.5
83.5750748.05-1,1501,900
83.9375706.25704.3-1,106.251,812.5
84.375662.5660.55-1,062.51,725
84.8125618.75616.8-1,018.751,637.5
85.25575573.05-9751,550
85.6875531.25529.3-931.251,462.5
86.125487.5485.55-887.51,375
86.5625443.75441.8-843.751,287.5
87400398.05-8001,200
87.4375356.25354.3-756.251,112.5
87.875312.5310.55-712.51,025
88.3125268.75266.8-668.75937.5
88.75225223.05-625850
89.1875181.25179.3-581.25762.5
89.625137.5135.55-537.5675
90.062593.7591.8-493.75587.5
90.55048.05-450500
90.93756.254.3-406.25412.5
910-1.95-400400
91.375-37.5-39.45-362.5325
91.8125-81.25-83.2-318.75237.5
92.25-125-126.95-275150
92.6875-168.75-170.7-231.2562.5
93.125-212.5-214.45-187.5-25
93.5625-256.25-258.2-143.75-112.5
94-300-301.95-100-200
94.4375-343.75-345.7-56.25-287.5
94.875-387.5-389.45-12.5-375
95-400-401.950-400
95.3125-368.75-370.731.25-400
95.75-325-326.9575-400
96.1875-281.25-283.2118.75-400
96.625-237.5-239.45162.5-400
97.0625-193.75-195.7206.25-400
97.5-150-151.95250-400
97.9375-106.25-108.2293.75-400
98.375-62.5-64.45337.5-400
98.8125-18.75-20.7381.25-400
990-1.95400-400
99.252523.05425-400
99.687568.7566.8468.75-400
10010098.05500-400
100.12510098.05500-400
100.56210098.05500-400
10110098.05500-400
101.43810098.05500-400
101.87510098.05500-400
102.31210098.05500-400
102.7510098.05500-400
103.18810098.05500-400
103.62510098.05500-400
104.06210098.05500-400
104.510098.05500-400
104.93810098.05500-400
105.37510098.05500-400
105.81210098.05500-400
106.2510098.05500-400
106.68810098.05500-400
107.12510098.05500-400
107.56210098.05500-400
10810098.05500-400
108.43810098.05500-400
108.87510098.05500-400
109.31210098.05500-400
109.7510098.05500-400
110.18810098.05500-400
110.62510098.05500-400
111.06210098.05500-400
111.510098.05500-400
111.93810098.05500-400
112.37510098.05500-400
112.81210098.05500-400
113.2510098.05500-400
113.68810098.05500-400
114.12510098.05500-400
114.56210098.05500-400
11510098.05500-400

The failure case

A five-percent decline ending at 95 loses 400. The opening credit was compensation for this unfavorable interval, not income without risk.

Check your understanding

Try the question before revealing its answer. These are reading checks, not trading certification or a site completion record.

What is whole-position terminal P/L at QLT 95.00, before costs?

Reveal the worked answer

$-400.00

Use all signed legs, not just the winning leg. The popup and graph use the same ticket.

Critical risk question

Does a terminal loss bound guarantee every early-assignment or liquidation outcome?

Reveal the worked answer

No.

It describes the specified common-settlement payoff. Product rules, stock delivery, capital and execution still matter.

Takeaway

Explain the intended large downside with an intermediate loss valley exposure, each leg's obligation and the adverse price region before using the strategy name.

Sources, assumptions and downloadable script

External references support definitions and conventions. Worked scenarios and prose are original. No current quotes or dealer inventory are claimed.

Read this lesson as Markdown · Download its JavaScript content module