Quantool · Reading CoursesFictional examples · no live trading
Advanced Options · ADV-04a · Advanced

Short straddle

How does short straddle express a short movement near one strike view?

One concept per page · original written lesson · 565 prose words · authored, not installed or production-approved

What you will learn and prerequisites

Read first: Read a contract and its premium, Rights, obligations and expiration, Defined payoff risk is not margin, Read the whole multi-leg ticket

A short straddle accepts obligations on both sides of one strike. Its center profit can look attractive, but one tail has no finite loss ceiling. This is advanced risk-taking, not a beginner income substitute.

Construction: read every leg

Sell the same 100 call and put for 4.20 each. The 840 credit is maximum terminal profit at exactly 100. Breakevens are 91.60 and 108.40. The short put's downside loss is large but finite; the uncovered call's upside loss is unbounded.

Read the ticket before the graph

BUY means you own an option right; SELL means you accept a short-option obligation. Positive quantities are long and negative quantities are short in the calculation. Check quantity, call/put, strike, multiplier and expiry before netting premium.

All legs in this example share November 20, 2026 expiration. The entry observation is October 6, 2026, with fictional QLT at 100. These are independent illustrative premiums, not a current option chain or executable quotes. The terminal diagram assumes every leg and any shares are resolved at one common settlement price.

Before expiry: time and volatility

Near the strike the usual exposures are short Gamma and Vega with positive Theta in common conditions. A quiet period can be followed by a gap that overwhelms accumulated decay. Near-expiry Delta changes can make hedging difficult.

Manage the position deliberately

First decide whether undefined risk is permitted and appropriate. A wing-protected iron butterfly is a different trade with a different credit. Predefine stress capacity and the response to a gap. A stop cannot promise an execution price.

Fictional teaching ticket · no order submission

Short straddle

QLT • reference spot $100 • independent illustrative prices • quote date 2026-10-06

Read action, quantity, type, strike, expiry, premium and multiplier before the payoff
ActionQtyTypeStrikeExpiryPremium/unitMultiplier
SELL1Call1002026-11-204.2100
SELL1Put1002026-11-204.2100
Opening option cash (+received / −paid)840 USD
Entry option fees in cost variant1.3 USD
Shares included0
Joint-terminal results—not a guarantee of interim cash requirements
MeasureBefore costsAfter stated entry fees
Maximum terminal profit840838.7
Maximum terminal loss magnitudeUnbounded in this terminal modelUnbounded in this terminal model
Breakeven settlement price(s)91.6, 108.491.613, 108.387

This is a mathematical expiry experiment using the displayed legs, not an executable quote. The slider range is not a risk limit.

$0.65 per option contract on entry only. No exit, assignment, financing or tax costs modeled.

Independent fictional premiums, not one simultaneous arbitrage-consistent chain. All legs realized simultaneously at intrinsic at the same expiry; terminal calculations do not model American early exercise, temporary unhedged positions, forced liquidation or live liquidity. Displayed chart domain is not a tail-risk cap.

From opening cash to a settlement result

Read the opening instructions: sell 1 100 call at 4.20; sell 1 100 put at 4.20. Option opening cash is $840.00 received as a credit. A received credit is not earned profit while the obligation remains open.

Set the common settlement price to 120.00. Calls have intrinsic value max(S−K,0); puts have max(K−S,0). Subtract the opening premium from each intrinsic value, then multiply by signed quantity and the 100-unit multiplier. Shares contribute their price change from their own cost. The calculation popup shows every leg.

The combined result is $-1,160.00 before costs and $-1,161.30 after illustrative opening fees of $1.30. Exit fees, slippage, funding, dividends and taxes are not included. Opening fees are 0.65 per option contract, not a statement of any broker's pricing.

Maximum terminal profit is $840.00; maximum terminal loss magnitude is unbounded in this model, before costs. Isolated zero-P/L settlement points in the model: 91.6, 108.4. Move the scenario slider across each strike and explain why the slope changes there. A strike is a contract threshold, not a prediction.

This terminal model is useful for comparing risk shapes, but actual American-style assignment, share delivery, forced liquidation or a failed multi-leg exit can produce a different path. A long protective leg is not an automatic instruction that a broker must exercise it when another leg is assigned.

Open the calculation without leaving this lesson

Calculate this exact ticket

Same-page calculation. Closing restores the lesson position and originating control.

P/L = Σ[q × multiplier × (intrinsic − opening premium)] + shares × (S−share entry) − costs

Intrinsic is nonnegative before the signed quantity is applied. This is a fictional terminal calculation.

  1. -1 × 100 × (20.00 − 4.20) = $-1,580.00: 100 call.
  2. -1 × 100 × (0.00 − 4.20) = $420.00: 100 put.
  3. Opening fees: 1.30.
Before costs $-1,160.00; after entry fees only $-1,161.30.

Maximum risk and breakevens

Same-page calculation. Closing restores the lesson position and originating control.

Evaluate S=0, all strikes and the final tail slope; solve P/L=0 on each linear segment.

Same-expiry payoffs are piecewise linear. A finite chart range cannot prove a tail is bounded.

  1. Maximum terminal profit is $840.00; maximum terminal loss magnitude is unbounded in this model, before costs.
  2. Breakeven points: 91.6, 108.4.
  3. Costs shift net P/L downward without moving the strikes.
Maximum terminal profit is $840.00; maximum terminal loss magnitude is unbounded in this model, before costs.

The whole ticket at common expiry

Vertical: P/L per complete ticket (USD)
Horizontal: Underlying settlement price (USD)

The whole ticket at common expirySolid combined curve is before fees; the second includes only the stated entry fees. Individual-leg lines explain construction. This is terminal intrinsic P/L, not current option value. Price can move outside the displayed range. The complete numerical data are available below.-796.417-442.11-87.8034266.503620.81975.117859197103109115
1. Combined terminal P/L before fees2. Combined terminal P/L after entry fees
Solid combined curve is before fees; the second includes only the stated entry fees. Individual-leg lines explain construction. This is terminal intrinsic P/L, not current option value. Price can move outside the displayed range.
See the individual legs behind the combined curveThe whole ticket at common expirySolid combined curve is before fees; the second includes only the stated entry fees. Individual-leg lines explain construction. This is terminal intrinsic P/L, not current option value. Price can move outside the displayed range. The complete numerical data are available below.-1,252.8-799.68-346.56106.56559.681,012.8859197103109115
1. Combined terminal P/L before fees2. Combined terminal P/L after entry fees3. Leg 1: SELL 1 100 call4. Leg 2: SELL 1 100 put
Read the graph as a data table
Complete graph data; original fictional observations or model calculations
Underlying settlement price (USD)Combined terminal P/L before feesCombined terminal P/L after entry feesLeg 1: SELL 1 100 callLeg 2: SELL 1 100 put
85-660-661.3420-1,080
85.375-622.5-623.8420-1,042.5
85.75-585-586.3420-1,005
86.125-547.5-548.8420-967.5
86.5-510-511.3420-930
86.875-472.5-473.8420-892.5
87.25-435-436.3420-855
87.625-397.5-398.8420-817.5
88-360-361.3420-780
88.375-322.5-323.8420-742.5
88.75-285-286.3420-705
89.125-247.5-248.8420-667.5
89.5-210-211.3420-630
89.875-172.5-173.8420-592.5
90.25-135-136.3420-555
90.625-97.5-98.8420-517.5
91-60-61.3420-480
91.375-22.5-23.8420-442.5
91.6-5.68434e-13-1.3420-420
91.751513.7420-405
92.12552.551.2420-367.5
92.59088.7420-330
92.875127.5126.2420-292.5
93.25165163.7420-255
93.625202.5201.2420-217.5
94240238.7420-180
94.375277.5276.2420-142.5
94.75315313.7420-105
95.125352.5351.2420-67.5
95.5390388.7420-30
95.875427.5426.24207.5
96.25465463.742045
96.625502.5501.242082.5
97540538.7420120
97.375577.5576.2420157.5
97.75615613.7420195
98.125652.5651.2420232.5
98.5690688.7420270
98.875727.5726.2420307.5
99.25765763.7420345
99.625802.5801.2420382.5
100840838.7420420
100.375802.5801.2382.5420
100.75765763.7345420
101.125727.5726.2307.5420
101.5690688.7270420
101.875652.5651.2232.5420
102.25615613.7195420
102.625577.5576.2157.5420
103540538.7120420
103.375502.5501.282.5420
103.75465463.745420
104.125427.5426.27.5420
104.5390388.7-30420
104.875352.5351.2-67.5420
105.25315313.7-105420
105.625277.5276.2-142.5420
106240238.7-180420
106.375202.5201.2-217.5420
106.75165163.7-255420
107.125127.5126.2-292.5420
107.59088.7-330420
107.87552.551.2-367.5420
108.251513.7-405420
108.4-5.68434e-13-1.3-420420
108.625-22.5-23.8-442.5420
109-60-61.3-480420
109.375-97.5-98.8-517.5420
109.75-135-136.3-555420
110.125-172.5-173.8-592.5420
110.5-210-211.3-630420
110.875-247.5-248.8-667.5420
111.25-285-286.3-705420
111.625-322.5-323.8-742.5420
112-360-361.3-780420
112.375-397.5-398.8-817.5420
112.75-435-436.3-855420
113.125-472.5-473.8-892.5420
113.5-510-511.3-930420
113.875-547.5-548.8-967.5420
114.25-585-586.3-1,005420
114.625-622.5-623.8-1,042.5420
115-660-661.3-1,080420

The failure case

At 120, the call owes 2,000 and the put expires worthless, producing a 1,160 loss after credit. A finite margin deposit does not cap the loss.

Check your understanding

Try the question before revealing its answer. These are reading checks, not trading certification or a site completion record.

What is whole-position terminal P/L at QLT 120.00, before costs?

Reveal the worked answer

$-1,160.00

Use all signed legs, not just the winning leg. The popup and graph use the same ticket.

Critical risk question

Does a terminal loss bound guarantee every early-assignment or liquidation outcome?

Reveal the worked answer

No.

It describes the specified common-settlement payoff. Product rules, stock delivery, capital and execution still matter.

Takeaway

Explain the intended short movement near one strike exposure, each leg's obligation and the adverse price region before using the strategy name.

Sources, assumptions and downloadable script

External references support definitions and conventions. Worked scenarios and prose are original. No current quotes or dealer inventory are claimed.

Read this lesson as Markdown · Download its JavaScript content module