Black–Scholes & Greeks · BSM-06 · Core

Approximation versus repricing

Why must both methods receive the same scenario?

Start small

Try spot +0.25, no IV change and no time passing. Then increase the spot move and compare the approximation error.

Change volatility separately

Reset the spot shock to zero, then change IV by one percentage point. Only after that combine spot and IV.

Use identical shocks

Both methods receive the accepted input changes. A request for 30 days passing on a 7-day option is rejected, not quietly floored in just one method.

Interpret the gap

The gap is approximation error within the same model. Even perfect model agreement does not prove an executable live-market result.

One concept per page · original written lesson · 374 prose words · authored, not installed or production-approved

Working scenario lab

The tool below is live. The written examples that follow retain their fixed fictional inputs.

What you will learn and prerequisites

Read first: Greeks without intimidation

A Greek approximation estimates local P/L; full repricing evaluates the same accepted new state under the model. Their difference is informative only when the input shocks, dates and units match.

Comparing different applied scenarios produces a software inconsistency disguised as model error.

Understand the mechanism

A common approximation includes Delta dS + 0.5 Gamma dS² + Theta dt + Vega dSigma + Rho dr + Epsilon dq. Here dt is positive elapsed calendar years. Additional cross terms are omitted, so combined large moves can diverge.

Full repricing is still exact only within its stated model and numerical accuracy, not exact future market P/L.

Walk through the process

Validate requested shocks first. Reject invalid resulting spot or negative volatility, or explicitly report a shared adjusted scenario. If elapsed time reaches expiry, use exact intrinsic for value and stop beyond the contract's life.

Apply the same validated state to the approximation and repricer. State which terms are included.

Read before applying

All numerical market states are hypothetical. The calculations illustrate a European continuous-yield model, not a quote feed. Financial-model validation, instrument suitability and executable pricing are separate questions.

A worked example

Starting at the common call, apply spot +0.50, IV +1 point and one calendar day elapsed. Delta contribution is 0.263782308; Gamma 0.006934859; Theta -0.051508870; Vega 0.113997676 per unit.

Estimated new value is 3.310780128; BSM revaluation at S=100.50, sigma=.26 and T=29/365 gives 3.308087339. Estimate minus revaluation is +0.002692789. The graph uses dollars per unit for every contribution.

A request for ten elapsed days on a seven-day option must be rejected or explicitly limited to seven for both methods. Charging ten days of Theta while pricing seven is not an honest approximation comparison.

Open the calculation without leaving this lesson

Scenario contributions

Same-page calculation. Closing restores the lesson position and originating control.

dV≈Delta dS+0.5 Gamma dS²+Theta dt+Vega dSigma

Use one shared scenario: dS=.50, dSigma=.01, dt=1/365.

  1. Delta contribution=0.263782308201
  2. Gamma contribution=0.006934858616
  3. Theta contribution=-0.051508869653
  4. Vega contribution=0.113997675882
  5. Estimated=3.310780128268; repriced=3.308087339302.
Difference +0.002692788966.

Approximation versus repricing—worked comparison

Vertical: Model P/L per option unit (USD)
Horizontal: Delta / Gamma / Theta / Vega contribution

Approximation versus repricing—worked comparisonFictional data from the written example. The chart organizes the comparison; its shape is not a forecast. The complete numerical data are available below.-0.0798851-0.005476360.06893240.1433410.217750.2921591234
1. Fictional example
Fictional data from the written example. The chart organizes the comparison; its shape is not a forecast.
Read the graph as a data table
Complete graph data; original fictional observations or model calculations
Delta / Gamma / Theta / Vega contributionFictional example
10.263782
20.00693486
3-0.0515089
40.113998

What would invalidate the reading?

Different scenario clamps or time horizons can make the error meaningless. Large shocks also require more than a low-order Taylor expansion.

Check your understanding

Try the question before revealing its answer. These are reading checks, not trading certification or a site completion record.

What is the essential comparison requirement?

Reveal the worked answer

Both methods use the same accepted shocks and model conventions.

The remaining difference can then be studied as approximation error.

Critical risk question

What is the critical failure to avoid?

Reveal the worked answer

Different scenario clamps or time horizons can make the error meaningless. Large shocks also require more than a low-order Taylor expansion.

Explain this risk before treating the example as a decision rule. A correct calculation does not guarantee a favorable market outcome.

Takeaway

Return to the question: Why must both methods receive the same scenario? State the observed facts, the assumptions and the failure condition separately.

Try it in the working lab

  1. Set spot change +0.25, IV/time/rate/yield changes zero.
  2. Compare local estimate and full-model repricing.
  3. Increase the spot shock, then add +1 IV point and inspect Vanna/Vomma contributions.

Your live inputs are independent of the fixed worked example above. Return to the “Lesson example” preset to reproduce it.

My reading record

Personal review marks are not quiz passes, course certification or trading approval. Old plugin progress is not overwritten.

Reset this preview's reading record?

Only the consolidated school’s local visit and personal-review record is reset. Your calculator inputs, narration preferences, WordPress records and previous plugin progress remain untouched.

Sources, assumptions and downloadable script

External references support definitions and conventions. Worked scenarios and prose are original. No current quotes or dealer inventory are claimed.